Breakdown Specialist LV Fitter

Thiess

📍 Murray Bridge, South Australia, Australia

Permanent Full Time Other Installation, Maintenance, and Repair Occupations

Job Description

About the role

As our next LV Breakdown Specialist to proudly represent our Maintenance Team on an 8/6 Day Shift only roster, you will live for challenges and thrive on the variety of work available. Like all of us at Thiess, you’re a passionate and energetic person, that appreciates responsibility, recognition and reward. 


In this role, you will:

  • Specialising in breakdowns of Light Vehicles, Ancillary vehicles and electrical work.

  • Perform the servicing, repair and maintenance of mobile fleet and other equipment in accordance with Thiess servicing, lubrication and maintenance systems documentation. 

  • Source technical information from the relevant available reference manuals, technical bulletins, OEM and computer based systems. 

  • Ensure good housekeeping standards are maintained at all times. 

  • Provide technical information to staff and operations personnel. 

  • Conduct technical inspections a...
  • Apply for this Position