Breakdown Engineer - Field Based (Electrical)

Adecco

📍 Wellingborough, Northamptonshire, United Kingdom

Full-time architecture-and-engineering

Job Description

Join Our Team as an Electrical Breakdown Engineer!

Driving License Required

Are you a problem-solver with a passion for engineering? Do you thrive in dynamic environments, tackling challenges head-on? If so, we have an exciting opportunity for you to shine as a Field based Breakdown Engineer. This role requires regular travel in and out of London therefore would suit someone living within proximity to this area or willing to travel daily.

Our client prides themselves on delivering top notch engineering solutions that make a difference. Our team is dedicated, innovative, and always eager to tackle the next big challenge. They are expanding their business and looking for someone like you to join the team.

What You'll Do:

As a Breakdown Engineer, you will be at the forefront of our operations, ensuring that the machinery runs smoothly and efficiently. Your responsibilities will include:

Diagnosing and resolving breakdown issues swiftly to minimise...
Apply for this Position